Engineering Projects

Select a project.

Starting Soon

East Highland PCC Patching Project (Elm Street to the end)

Project Date
July 15, 2010
Description:

This project is for the full-depth...

Ferry Street Reconstruction Project (Finley to Mary)

Project Date
July 15, 2010
Description:

6th Street Reconstruction (Ottumwa Regional Airport)

Project Date
April 30, 2010
Description:

This...

Fox-Sauk Road Reconstruction Project

Project Date
July 30, 2010
Description:

This project will consist of full-depth PCC replacement of Fox-Sauk Road from North Court...

Chester Avenue Reconstruction Project

Project Date
July 30, 2010
Description:

This project is for the full-width, full-depth reconstruction with curb and gutter of...

Street Crack Repair Program 2010

Project Date
September 7, 2010
Description:

This project is for hot mix asphalt (HMA), Portland concrete cement (PCC) street crack...

Currently Underway

South Side Sewer Separation Phase III, Division 1

Project Date
December 8, 2009
Description:

The City of Ottumwa has a combined storm and sanitary sewer system.  This means that storm runoff and household...

Asphalt Street Repair Program 2010

Project Date
June 14, 2010
Description:
This project is for our annual asphalt...

WPCF Headwork's Building Improvements

Project Date
April 8, 2009
Description:

This project is for the improvements of the Headwork’s treatment building at the Water...

WPCF Biosolids Storage Facility Expansion

Project Date
July 24, 2009
Description:
The City of Ottumwa Water Pollution Control Facility has recently completed a Facility Plan...

Ottumwanoc Tribal Trail Connection (John Deere Loop Segment 4)

Project Date
June 12, 2010
Description:
This project is for the construction a of trail along the south levee of the Des Moines River,...

Wapello Street Extension HMA Resurfacing (Albia Road to Hwy 34)

Project Date
April 30, 2010
Description:

This project is for the full-depth...

Recently Completed

River Drive Reconstruction (Market to Green)

Project Date
April 16, 2010 - June 6, 2010
Description:

WPCF Electromagnetic Flow Meter Installation

Project Date
September 21, 2009 - April 6, 2010
Description:
This project was for the installation of an Electromagnetic Flow Meter at the Water Pollution...