User login

Engineering Projects

Select a project.

Starting Soon

Asphalt Street Repair

Project Date
March 31, 2008
Description:

This project is for our annual asphalt street repair program and is used to set unit price cost. Projects are...

Street Patch & Repair Program

Project Date
March 31, 2008
Description:

This is our annual bid letting to retain a contractor for street repairs. The work will consist of curb and...

Street Crack Repair Program

Project Date
March 31, 2008
Description:

This project is for hot mix asphalt (HMA), Portland concrete cement (PCC) street crack repair. Letting date to be...

Mill Street

Project Date
March 31, 2008
Description:

This project is for full width, full depth PCC reconstruction. CIP funded.  Serving various businesses and...

Catch Basin Replacement

Project Date
March 31, 2008
Description:
This project will consist of reconstruction and raising of catch basin wells with new grates.  Basins are located on...

Currently Underway

Ottumwanoc Tribal Trail

Project Date
June 21, 2007
Description:

This project consists of hot mix asphalt (HMA) surfaces on top of a section of the Des Moines River levee from...

South Side Sewer Separation

Project Date
March 19, 2007
Description:

The City of Ottumwa has a combined storm and sanitary sewer system.  This means that stormwater runoff and...

Elm Street

Project Date
May 23, 2007
Description:

This project consisted of full depth PCC patch with HMA overlay, some curb and gutter repair and some catch basin...

College Street Curb & Retaining Wall

Project Date
July 5, 2007
Description:
This project is for the installation of a retaining wall adjacent to an alley that intersects College Street.  The...

Recently Completed

Al-jon & 1st Avenue

Project Date
July 23, 2007
Description:

This project was for full width, full depth PCC reconstruction of Al-jon Avenue from Terminal Avenue to 1st Avenue...

10th Street Reconstruction

Project Date
August 20, 2007
Description:
This project consisted of full width, full...

K Avenue Reconstruction

Project Date
August 20, 2007
Description:
This project consisted of full width, full...

East Court Sewer

Project Date
May 22, 2007
Description:

This project consisted of sanitary sewer and utility access installation starting just north of Steller Avenue...

Market Street Flood Wall Repair

Project Date
July 16, 2007
Description:
This project consisted of repair to the Market Street flood wall.  Contractor for this project was Turner Concrete...

Market Street River Wall Repair

Project Date
July 11, 2007
Description:

This project consisted of repair to the Market Street river wall.  Contractor for this project was Turner...